Home
Products
About Us
Factory Tour
Quality Control
Contact Us
Request A Quote
Home ProductsDecorative Powder Coating

Interior / Patio Furniture Powder Coating 250±50 Gel Time Impact Resistant

Good quality Pipeline Powder Coating for sales
Good quality Pipeline Powder Coating for sales
I'm Online Chat Now

Interior / Patio Furniture Powder Coating 250±50 Gel Time Impact Resistant

China Interior / Patio Furniture Powder Coating 250±50 Gel Time Impact Resistant supplier
Interior / Patio Furniture Powder Coating 250±50 Gel Time Impact Resistant supplier Interior / Patio Furniture Powder Coating 250±50 Gel Time Impact Resistant supplier

Large Image :  Interior / Patio Furniture Powder Coating 250±50 Gel Time Impact Resistant

Product Details:

Place of Origin: Tianjin,China
Brand Name: Greentech
Certification: SGS
Model Number: 3524

Payment & Shipping Terms:

Minimum Order Quantity: 500kg
Price: $2.6-5.8/kg
Packaging Details: 20kg/carton
Supply Ability: 1000 tons per month
Contact Now
Detailed Product Description
Raw Material: Epoxy Polyester Hybird Resin Color: Ral Color
Usage: Indoor Gel Time: 250±50
Application Method: Electrostatic Spray Gloss: High/Low/Matt

electrostatic epoxy polyester resin powder coating

 

Feature:

  1. Excellent adhesion, flexibility, impact resistance, high hardness. Good flow property, vividness, fullness, saturation, beautiful decoration.
  2. To improve the reaction rate of the material, to enhance the effect of seculars reflection, light saturation capacity. Reflection effect, decorative effect is improved.
  3. The protection of pigment is much better.
  4. Giving coating more functional elements according to the different requirement, such as waterproof and rust-proof.
  5. Make the powder coating easy to reach grooves, corner.
  6. Powder rate is high, the coating with high efficiency, spraying area is large, the cost is lower than the paint coating.
  7. Environmental protection, excluding volatile matter, no smell of paint, do not contain heavy metals and polybrominated biphenyl (certification testing by SGS), in line with the international general standards, without any toxic and side effects

 

Item Test standard and method Test
Appearance Color uniform, loose without blocking, dry coating liquidity 120—140mm visual
color As customer required Chromatic meter
Adhesion GB/T9286-1998 ISO2409 0 class
Impact resistance GB/T1732-1993 ISO6272 50kg.cm
flexibility GB/6742-1986 ISO1519 3mm
Cupping test GB/T9753-1993 ISO1520 8mm
Pencil hardness GB/T6739-1996 ASTM/D3363 1H-2H
Salt spray testing GB/T1771-1991 ISO7253 > 500hour
Heat resistance 150℃/24 hours(white) <0.5
Humid and hot resistance GB/T1740-1979 ISO6270 >1000hous
         

 

Application areas: air conditioning, refrigerator, microwave ovens, cooking hoods electric kettles and other household appliances shell

Contact Details
Greentech (Tianjin) Anti-corrosion Engineering Tech Co.,Ltd

Contact Person: Mr zhao

Send your inquiry directly to us (0 / 3000)